The hardware installation team are technicians responsible for the installation of all Suprema hardware, timeware® access control unity, fire monitors and assembly points.
When working on a project, the team will refer to the site survey notes prepared by the team lead.
The team utilise the Suprema device PSU and the Suprema wall mounts developed by timeware® on every project.
A neat installation is extremely important. You will never see a timeware® installation where the devices are plugged into a 3 pin wall plug or where the network cable can be unplugged!
Duration: approx 1 day per door/turnstile or up to 3 attendance points.
insider_issue_18-pg22_hardware-inst.jpg

Suprema is now the go-to hardware for all new and upgrade projects.